Project Description

The Henry Lawson Drive Upgrade Stage 1B will provide more capacity for vehicles travelling through Henry Lawson Drive between Milperra Road / Newbridge Road and the M5 Motorway. The Henry Lawson Drive Upgrade – Stage 1B will improve efficiency along the corridor and safety for motorists and pedestrians between Auld Avenue and the M5 Motorway at Milperra.

 
Scope of Engagement

Axess is providing Independent Verification (IV) of the Health and Safety in Design (HSiD) processes undertaken and outputs produced by the technical advisor, in compliance with Work Health and Safety legislation as embodied in the Safe Work Australia Code of Practice: Safe Design of Structures. As the IV will review supporting HSiD project documentation to produce a HSiD IV Report and HSiD Certificate. 

CLIENT

Aurecon

SERVICE

Independent Verification – Health and Safety in Design

AxessAdvisory-HenryLawsonDriveUpgrade2.png
AxessAdvisory-HenryLawsonDriveUpgrade1.png
bottom of page